Tuesday, June 18, 2013

TEE International

TEE International: its 49% owned unit has formed a 30/50/20 consortium with Cisco Engineering and Lam Water Solution to enter into a contract with Bangkok Metropolitan Administration worth THB 210m ($8.6m), to manage and control the water level at Makkasan Water Catchment area by periodically pumping water into the Chao Phaya River. The contract had commenced 1 May 2013, and will last for a period of 3 yrs.

No comments:

Post a Comment